Gerstein Lab Computing in HPC
From GersteinInfo
Line 44: | Line 44: | ||
Total: 1127 TB 83% used (193 TB free) | Total: 1127 TB 83% used (193 TB free) | ||
- | + | = Actual CPU Usage = | |
- | + | Grace Shared:258,948 h (equivalent to ~120 cores at 100% utilization) | |
- | Actual CPU Usage | + | Grace Dedicated 371,982 h (equivalent to ~175 cores at 100% utilization) |
- | + | ||
- | + | ||
- | + | ||
Grace Scavenge 362,890 h (equivalent to ~165 cores at 100% utilization) | Grace Scavenge 362,890 h (equivalent to ~165 cores at 100% utilization) | ||
Grace Total 993,820 h (~462 cores but own 672) | Grace Total 993,820 h (~462 cores but own 672) |
Revision as of 12:56, 23 October 2018
Contents |
Current Hardware
Compute
Grace
33 nodes, 672 cores purchased in 2015
Farnam
32 nodes, 256 cores purchased in 2010-2011
2 nodes, 64 cores purchased in 2012 (will be shutdown in 2019)
11 nodes, 308 cores purchased in 2018
1 large memory node (1.5TB RAM), 40 cores purchased in 2018
3 GPU nodes (2xNVIDIA K80), 60 cores purchased in 2016
2 GPU nodes (2xNVIDIA P100), 56 cores purchased in 2018
1 GPU node(4xNVIDIA TITAN V), 8 cores purchased in 2018
Total: 20 nodes, 536 cores
- 32 nodes were shutdown in September 2018
Storage
Loomis
3 TB default allocation
300 TB purchased in 2015
100 TB purchased in 2016
Total: 403 TB 93% used (27 TB free)
Farnam
4 TB default allocation
90 TB purchased in 2014
276 TB purchased in 2017
757 TB purchased in 2018
Total: 1127 TB 83% used (193 TB free)
Actual CPU Usage
Grace Shared:258,948 h (equivalent to ~120 cores at 100% utilization) Grace Dedicated 371,982 h (equivalent to ~175 cores at 100% utilization) Grace Scavenge 362,890 h (equivalent to ~165 cores at 100% utilization) Grace Total 993,820 h (~462 cores but own 672)
Farnam Shared 108,789 h (equivalent to ~50 cores at 100% utilization) Farnam Dedicated 262,642 h (equivalent to ~120 cores at 100% utilization) Farnam Dedicated - GPU 13,250 h Farnam Scavenge 29,527 h (equivalent to 13 cores at 100% utilization) Farnam Total 414,208 h (~183 cores but own 536)
Ruddle Total 1,486 h� Available Options (Rough Pricing and subject to change)
Standard Compute Node (28 cores, 192GB RAM) $12,000 GPU Node (28 cores, 192GB RAM, 1 V100) $22,000 Large Memory Node (28 cores, 768GB RAM) $19,000 Thinksystem D2 chassis (1 per 4 std nodes/2 GPU nodes) $2,000
Next Steps from 10/19/2018 Meeting
$55-75k available - Dave to contact Janine Martinez for details of grant(s) and any additional detail on funding available. Purchasing additional storage will be impossible in the time-frame due to the need to purchase in ~1PB increments. The nature of the work suggests that Farnam is the appropriate place to put new equipment. Prices for: Large Memory Node (28 cores, 768GB RAM) Large Memory Node (28 cores, 1536GB RAM) Standard Compute Node (28 cores, 192GB RAM) Standard Compute Node (28 cores, 384GB RAM)